Ethique
Posted onGreat work by the team to navigate the steel structure & keeping with the designers clean lines and high ceilings. Recently completed on the 3rd floor of the Sudima City office building (Christchurch). Panasonic VRV system featuring ten ducted systems. R&D lab hood extraction system. Energy efficient heat recovery ventilator with fresh air.